Skip to main content

 

FAQ

 

If approved, when would the building process begin and what is the approximate timeline for completion?

Final financial options and building timeline will be presented at a special congregation meeting in early 2026. If approved, documents and contractor bidding must then be completed before construction. Construction could potentially begin in late Summer 2026 with 14 to 16 months for the entire project to be completed by September/October 2027.

Is there a priority list?

The Building Committee recommends the following priorities: 1) School Safety/School Office addition, 2) Music Wing addition, 3) Church Administration/Meeting Rooms addition, 4) Cafeteria addition. However, final priority decisions will be up to the congregation to determine.

Do you plan to get quotes from local, general contractors and subcontractors?

The construction delivery method is not yet determined, but a local general contractor will be selected to complete our construction with the assistance of local subcontractors.

Can the cafeteria be completed so there will be proper seating for two teams of fans in the gym with space for locker rooms and for the next teams coming in?

The addition of a cafeteria will provide additional room for incoming teams and fans before and after games. With removing the cafeteria tables currently lined up on the north side of the gym, there will be additional room on the gym floor for teams and fans. Also, locker rooms are included in this project as shown in the drawings.

Will the congregation members be able to help with cost saving measures like demolition of spaces ourselves?

Volunteer workdays for congregation members will be considered by the Building Committee and in coordination with the contractor.

How will we ensure minimal disruption to the teaching/school year?

Student safety and security will be of utmost importance. Major construction will occur during the summer school recess.

How many meeting rooms are there for small
groups?

The current design includes two meeting rooms within the church office addition. There is also one meeting room included within the school office addition that could also be used for evening church meetings when not in use by the school.

How many parking spaces and handicap-compliant parking spaces will there be?

There are currently 286 parking spaces, and 14 are handicap accessible. The proposed site plan has 283 parking spaces with 11 being handicap accessible. More study is planned on parking capacity.

How will we prepare to meet our additional costs? How much more will it add to our budget?

The full building project will increase our square  footage by 21%. Maintenance and utility costs are expected to increase slightly less than this percentage with economies of scale and improved energy savings in the new and renovated areas. We may need to budget a 20% increase in utilities, maintenance fees, and insurance costs as the building project comes online.

If someone has/is giving toward the future building fund, how much does that total now?

As of June 2025, there is $194,010 in the Future Building Fund. We started the year with $240,008 in the fund and have received $7,943 so far this year in additional donations. We have spent $53,941 this year on consulting fees, architect, etc.

Will the church/congregation be willing to take
on a mortgage?

This is a question that only the congregation can answer, and it will be asked at the voters’ meeting after the first of the year. Depending on how much is raised through pledges in this capital campaign, we will have information to share on mortgage rates, potential loan amounts, etc. if necessary. Only the congregation can approve a mortgage for the church.

Could you talk about the new security provisions?

The design includes several security provisions, with more to be developed throughout the planning process. A few key provisions include:
• Dedicated entrances that increase visibility and are an external deterrent for people not
needing access to the school.
• A secured vestibule at the school entrance that allows for safe visitor management.
• Administrative offices placed at the entryway for improved safety and hospitality.
• Private office space for positions that require emotional safety and trust
(i.e., administration, nurse, counselor, pastor, etc.).
• Extended care relocation, will ensure secure pickup and drop-off.
• A secured vestibule at the church entrance also enhances school security by improving church- side visitor management and access to shared spaces like the sanctuary.

Can we purchase additional land or create another entrance on Lois Lane?

We are currently exploring that possibility.

Will the music room be used by church choirs?

Yes, the music room will be shared by church choirs and ESM’s music program.